# NI Water tenders £29.95m contract for ICA equipment supply and maintenance

> NI Water is seeking suppliers across 12 brand-specific lots to supply and maintain its instrumentation, control and automation equipment. The framework could run to 2035 and is meant to improve standardisation while keeping legacy kit supported.

Published 23 November 2026 by The Water Wire. Topic: Investment & infrastructure. Canonical: https://www.waterwire.co.uk/story/ni-water-tenders-ica-equipment-contract

NI Water has gone out to tender for the supply and specialist maintenance of its instrumentation, control and automation (ICA) process equipment. The total estimated value is £29.952m, according to a contract listing published by [Waterbriefing](https://waterbriefing.org/home/contracts/item/26396-ni-water-tenders-c%C2%A330-million-contract-for-supply-and-maintenance-of-instrumentation-control-and-automation-equipment).

## What we know

[Waterbriefing](https://waterbriefing.org/home/contracts/item/26396-ni-water-tenders-c%C2%A330-million-contract-for-supply-and-maintenance-of-instrumentation-control-and-automation-equipment) reports the following details:

- **Scope:** supply, specialist maintenance and repair of ICA process equipment, covering original equipment manufacturer (OEM) equipment, spares, consumables and specialist support.
- **Lots:** the work is divided into 12 lots, each tied to a manufacturer. Values are stated including VAT:
  - Siemens: £9,285,120
  - ABB: £7,488,000
  - Hach Lange laboratory equipment: £4,492,800
  - Endress+Hauser, Palintest and Allen Bradley: £1,497,600 each
  - Grundfos (Metasphere) and Socomec: £898,560 each
  - Mitsubishi, Badger, Omron and Refex: £599,040 each
- **Total:** the lot values add up to the £29.952m headline figure. The listing does not say whether that total includes VAT.
- **Term:** the estimated contract period runs from 1 March 2027 to 28 February 2029. Annual extension options could take it to 28 February 2035.
- **Deadlines:**
  - Enquiries close at 12:00pm on 7 December 2026.
  - Tenders are due by 12:00pm on 14 December 2026.
  - The estimated award decision date is 19 February 2027.
- **Documents:** bidders are directed to the eTendersNI portal for the tender documents.

## Background

According to [Waterbriefing](https://waterbriefing.org/home/contracts/item/26396-ni-water-tenders-c%C2%A330-million-contract-for-supply-and-maintenance-of-instrumentation-control-and-automation-equipment), NI Water's longer-term strategy for this equipment has two aims:

- improve standardisation and whole-life value;
- keep support in place for legacy ICA equipment already installed across its assets.

The brands named cover several types of kit:

- **Control systems and automation:** Siemens, Allen Bradley, Mitsubishi and Omron.
- **Instrumentation and analysis:** ABB, Endress+Hauser, Hach Lange and Palintest.
- **Metering and telemetry:** Badger and Metasphere (Grundfos).
- **Power equipment:** Socomec.

## What to watch

- Whether the official notice confirms if the £29.952m total includes VAT.
- Clarification questions raised before the 7 December enquiry deadline, and the number of bids per lot by 14 December.
- The award decision, expected around 19 February 2027, before the estimated contract start on 1 March 2027.
- Whether NI Water uses the extension options, which would take the arrangement to 2035.

Splitting the contract by manufacturer reflects a basic fact about ICA estates. Once a utility has standardised on a vendor's control systems or instruments, it relies on that vendor's OEM spares and support for years.

The lot values show where NI Water's dependency is greatest. Siemens and ABB together account for about £16.8m of the £29.95m total, more than half the estimated spend.

The two stated aims pull in different directions. Greater standardisation tends to mean fewer platforms. Keeping legacy equipment supported means continuing to pay to run older kit. How NI Water balances the two will matter for its operational resilience and its costs.

The possible run to 2035 makes this more than a short-term supply arrangement. With brand-specific lots, competition will be limited to suppliers able to provide each manufacturer's equipment and service.

Several details remain open until the official notice is checked:

- the VAT basis of the headline figure;
- how the contract relates to NI Water's existing ICA and maintenance arrangements.

## Sources

- [Waterbriefing — NI Water tenders c.£30 million contract for supply and maintenance of ICA equipment](https://waterbriefing.org/home/contracts/item/26396-ni-water-tenders-c%C2%A330-million-contract-for-supply-and-maintenance-of-instrumentation-control-and-automation-equipment)
